Home Page ButtonAbout Us ButtonContact Us ButtonLinks Button
Weldgrip Geotechnical LogoGound Stabalisation solutions for the civil engineering and mining industries - Strapline
AM1000-1 Thixotropic Grout
Weldgrip Products

- Machinery

- Universal Grout System
- AM1000-1 Thixotropic Grout
- Grout Pump Systems
- Turmag Drilling Machine
- Gopher Drilling Machine

- Reinforcement

- Self Drilling Steel Anchor System
- Composite Self Drilling Soil Nails
- Gripforce® Composite Soil Nails & Rockbolts
- FT500 Fully Threaded Composite Bar & Tube
- ATB700 Fully Threaded Bar & AT Rockbolts

- Ancillaries


- Drill Bits
- Drill Steels

- Mesh Products

- Double Twisted Hexagonal PVC Coated Mesh
- Gabions & Mattresses

Weldgrip Case Studies
- Dawlish Cliff Stabilisation
- Ramsden Bellhouse & Kent Hill
- Flood Risk Management
- Boness Embankment Stabalisation
- A259 Road Stabilization
- Doveholes Stabilisation
- Kingsand Sea Defence
- Lancaster Canal
- Coalfields Link
- Whitehaven Harbour
- Blaston Hollow
- A638 Rocknetting
- Chatham Dock
- Tondu Iron Works
- Brokenberry Quarry
- A5 - North Wales
- The Sidmouth Cliffs
- Conway Castle
- Glenholt Tunnel
- Athens Metro
- The Bradway Tunnel
- PorthKerry Tunnels
- Conisbrough Tunnel
- Face Salvage
- Mesh Cage System






  AM1000-1 Thixotropic Grout

Thumbnail - Click for  Enlargment
 
Product description:
AM1000-1 is a non-shrink, chloride free, Thixotropic Grout that achieves high strengths very quickly.

Packaging & Storage:
25kg bags, shelf life 6 months when stored in suitable
dry conditions.

Technical Data:

Grain size: 0 0.6mm
Yield: 13.5litres/25kg bag
Expansion Rate: 1.0 Vol %
Water/solid ratio: 0.20

Compressive strength:

After 4 hours:
After 12 hours:
After 24 hours:
After 28 days :
approx 2.5 N/mm²
approx 35 N/mm²
approx 50 N/mm²
approx 85 N/mm²

Anchor Load: 30mm/bond length of 1.5m

After 4 hours:
After 12 hours:
After 24 hours:
approx 50 kN
approx 350kN
approx 400 kN

Mixing and Pumping:

Mix the AM1000-1 with the prescribed amount of water for at least 3 minutes and fill the borehole through the pumping lance from a suitable pump (e.g. the Weldgrip Universal Grout Pump System). Immediately after filling insert the anchor. Very high or low ambient temperatures may influence the curing process

 

Download the Printable PDF Brochure

If you would like to print this case study you can download the full printable brochure in PDF format.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

Download the Case Study in PDF Format
Divider
© 2008 Weldgrip Geotechnical , All Rights Reserved