Home Page ButtonAbout Us ButtonContact Us ButtonLinks Button
Weldgrip Geotechnical LogoGound Stabalisation solutions for the civil engineering and mining industries - Strapline
Weldgrip Fibregrip ® Rockbolts and Fibre Mesh
Weldgrip Products

- Machinery

- Universal Grout System
- AM1000-1 Thixotropic Grout
- Grout Pump Systems
- Turmag Drilling Machine
- Gopher Drilling Machine

- Reinforcement

- Self Drilling Steel Anchor System
- Composite Self Drilling Soil Nails
- Gripforce® Composite Soil Nails & Rockbolts
- FT500 Fully Threaded Composite Bar & Tube
- ATB700 Fully Threaded Bar & AT Rockbolts

- Ancillaries


- Drill Bits
- Drill Steels

- Mesh Products

- Double Twisted Hexagonal PVC Coated Mesh
- Gabions & Mattresses

Weldgrip Case Studies
- Dawlish Cliff Stabilisation
- Ramsden Bellhouse & Kent Hill
- Flood Risk Management
- Boness Embankment Stabalisation
- A259 Road Stabilization
- Doveholes Stabilisation
- Kingsand Sea Defence
- Lancaster Canal
- Coalfields Link
- Whitehaven Harbour
- Blaston Hollow
- A638 Rocknetting
- Chatham Dock
- Tondu Iron Works
- Brokenberry Quarry
- A5 - North Wales
- The Sidmouth Cliffs
- Conway Castle
- Glenholt Tunnel
- Athens Metro
- The Bradway Tunnel
- PorthKerry Tunnels
- Conisbrough Tunnel
- Face Salvage
- Mesh Cage System






Tunnel Reinforcement - Weldgrip Gripforce ® Rockbolts and Fibre Mesh

Case Study Project Info
Project Title Bradway Tunnel Reinforcement
Client Railtrack
Main Contractor Amalgamated Construction Co. Ltd
Featured Products Weldgrip Fibregrip ® Rockbolts and Fibre Mesh

Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
The Bradway Tunnel maintenance project was part of the upgrading of the Midland Main Line rail network, and involved replacing a bulged area of the brickwork lining in the roof and sides.

To achieve this, a temporary support system was required to maintain the integrity of the brickwork. Weldgrip Fibregrip ® Rockbolts were used to offer a safe support system for the brick tunnel lining, enabling cutting out and replacement of the bulged brick section.

A high density of rock bolts was installed in the bulged area and placed through a polymer geogrid at 0.75m centres in a grid pattern. The Fibregrip ® Rockbolts used were 22mm diameter x 2m long, with a tensile and shear strength of 470kN and 129kN respectively. They were installed in 28mm diameter holes and spun through polyester resin capsules which had a cure time of 5 minutes.

A standard 80kN nut and a 150mm diameter round high load plastic end plate was used to tighten the bolt end assembly to the brickwork and polymer geogrid. The rockbolts were cut back to the tunnel lining as the bulge was removed and the brickwork repaired.

The Weldgrip Fibregrip ® Rockbolt system delivered the following advantages to the maintenance project:

  • Safe method of working during installation
  • Quick and effective method of reinforcing the bulged section of brickwork
  • Lightweight construction of the rockbolts allowed easy handling during installation and removal
  • High shear & tensile strength of the rockbolts gave excellent support to the brickwork in the bulged areas
  • Weldgrip Fibregrip ® Rockbolt system provided a cost effective solution
  • Cutability of the rockbolts allowed a quick method of removal as the brickwork was repaired
 

Download the Printable PDF Brochure

If you would like to print this case study you can download the full printable brochure in PDF format.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

Download the Case Study in PDF Format
Product Brochure - Soil Nails & Rockbolts - 620k
Divider

BBA Certificate
Weldgrip are also proud to have attained BBA accreditation and ISO 9001 standards in recognition of our continuing excellence in Geotechnical products and services.
ISO 9001