Home About Contact News
Minova Weldgrip
Weldgrip Gripforce ® Rockbolts
Weldgrip Products

- Machinery

- Universal Grout System
- AM1000-1 Thixotropic Grout
- Grout Pump Systems
- Turmag Drilling Machine
- Gopher Drilling Machine

- Reinforcement

- Self Drilling Steel Anchor System
- Composite Self Drilling Soil Nails
- Gripforce® Composite Soil Nails & Rockbolts
- FT500 Fully Threaded Composite Bar & Tube
- ATB700 Fully Threaded Bar & AT Rockbolts

- Ancillaries


- Drill Bits
- Drill Steels

- Mesh Products

- Double Twisted Hexagonal PVC Coated Mesh
- Gabions & Mattresses

Weldgrip Case Studies
- Dawlish Cliff Stabilisation
- Ramsden Bellhouse & Kent Hill
- Flood Risk Management
- Boness Embankment Stabalisation
- A259 Road Stabilization
- Doveholes Stabilisation
- Kingsand Sea Defence
- Lancaster Canal
- Coalfields Link
- Whitehaven Harbour
- Blaston Hollow
- A638 Rocknetting
- Chatham Dock
- Tondu Iron Works
- Brokenberry Quarry
- A5 - North Wales
- The Sidmouth Cliffs
- Conway Castle
- Glenholt Tunnel
- Athens Metro
- The Bradway Tunnel
- PorthKerry Tunnels
- Conisbrough Tunnel
- Face Salvage
- Mesh Cage System



 




 

 

 

Weldgrip Gripforce ® Rockbolts, Drilling Machines, Drill Steels and PVC Coated Steel Mesh

Case Study Project Info
Project Title Athens Metro
Client SOGEA Attiko Metro A.E. & Olympic Metro Public Works [MOC]
Main Contractor Olympic Metro
Featured Products Weldgrip Gripforce ® Rockbolts

Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
The Athens Metro construction project is one of the largest and most complex in Europe. The project was managed by Attiko Metro A.E. with a consortium of 25 Greek, German and French companies as the main contractors, known as Olympic Metro.

The Metro, with a construction cost in excess of 2.2 billion ECU, consists of 2 lines and 21 stations and will serve approximately 140,000,000 passengers annually.

Two 9.5m diameter tunnel-boring machines (TBM's) were used to construct 11.7 km of tunnel, a further 2.5 km being excavated by cut and cover methods.

The New Austrian Tunnelling Method (NATM) was used primarily for the station galleries, subways and access ways. The geology of the tunnels was mainly heterogeneous fractured schist. There were also occurrences of limestone and peridotite. Due to the nature of the strata additional support was required in the roof, tunnel sides and floor.

Fibregrip ® 22mm and 32mm fibreglass rockbolts were used for both permanent and temporary support in these areas. In areas of the roof where the strata was fractured 32mm and 22mm bolts 12m long were installed forward at the face of the drivage before being excavated by the TBM.

In the areas where the station cross cuts thirled into the main drivage the tunnel sides were reinforced by 22mm diameter Fibregrip ® rockbolts. Due to the ingress of water, particularly in the areas of the tunnel where the limestone contained porous limestone deposits, floor heave caused problems. This was overcome by floor bolting using 22mm diameter Fibregrip ® bolts. These could be easily cut out when the floor was regraded. The Fibregrip ® rockbolts used in this project were a polyester glass fibre bars with tensile strengths of 470kN and 820kN and 275kN.

All bolts were installed into pre-drilled holes filled with OPC grout.

The advantages found in using the rockbolts were: -

  • Ease of installation due to the products light weight.
  • The bolts are easily cut out by the TBM's without damaging the machine's cutting heads.
  • Bolts that have been partially cut out continue to provide reinforcement.
  • The high tensile strengths of the Fibregrip ® bolts provide excellent reinforcement in the Limestone and Schist strata beds.
 

Download the Printable PDF Brochure

If you would like to print this case study you can download the full printable brochure in PDF format.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

Download the Case Study in PDF Format
Product Brochure - Soil Nails & Rockbolts - 620k
Divider

BBA Certificate
Weldgrip are also proud to have attained BBA accreditation and ISO 9001 standards in recognition of our continuing excellence in Geotechnical products and services.